COD_Central Plant Upgrade Phase 1 Bid No. 41-98P-0600-CPU-Phase 1

Remove and reinstall an existing 300 Ton Chiller at the Central Plant. This work includes installation of all required infrastructure and utilities to reconnect the Chiller to the System.
Plans (click to expand/collapse)