COD_Central Plant Upgrade Phase 1 Bid No. 41-98P-0600-CPU-Phase 1

Remove and reinstall an existing 300 Ton Chiller at the Central Plant. This work includes installation of all required infrastructure and utilities to reconnect the Chiller to the System.
Addendum #1 (click to expand/collapse)
Name Size
CP Upgrade Addendum 01 Pkg- 01.18.2024 594.4 KB
Addendum #2 (click to expand/collapse)
Name Size
CP Upgrade Addendum 02 Pkg 01.31.2024 3.0 MB