COD_Palm Springs Development Project - BUILDING
SITE IMPROVEMENTS AND FOUR NEW BUILDINGS FOR INCREMENT 2/3 ARE AS FOLLOWS: THE ACCELERATOR BUILDING CONSISTS OF A 2 STORY ACADEMIC BUILDING AND THE APPROXIMATE GSF OF THE BUILDING TOTALS 90,435 SF. THE CULINARY BUILDING CONSISTS OF A SINGLE STORY CULINARY ARTS ACADEMIC BUILDING, AND THE APPROXIMATE GSF OF THE BUILDING TOTALS 38,005 GSF. THE EVENT CENTER BUILDING CONSISTS OF A 1 STORY EVENT VENUE, AND THE APPROXIMATE GSF OF THE BUILDING TOTALS 24,482 GSF. THE CAMPUS SUPPORT BUILDING CONSISTS OF A 1 STORY MAINTENANCE & OPERATIONS BUILDING, SERVICE YARD AND CENTRAL UTILITY PLANT, AND THE APPROXIMATE GSF OF THE OCCUPIED BUILDING SPACE TOTALS 14,215 SF. THE SITE SCOPE OF WORK INCLUDES: SITE PREPARATION, GRADING & DRAINAGE, STORMWATER MANAGEMENT, NEW UTILITY SERVICES TO CAMPUS BUILDINGS, FIRE ACCESS PLANS, ONSITE IMPROVEMENTS, AND FRONTAGE (OFFSITE) IMPROVEMENTS. PLEASE NOTE THAT ONSITE ROUGH GRADING AND A PORTION OF UNDERGROUND UTILITIES WERE PREVIOUSLY BID OUT FOR INCREMENT 1.
Specs
(click to expand/collapse)
Name | Size | ||
00_COD Front End Docs & Exhibits_COMBINED | 30.2 MB | ||
05_INC 02_SPECS | 66.6 MB | ||
06_Geotechnical Report_V1 | 9.5 MB | ||
07_HazMat Report | 7.3 MB | ||
08_HazMat Procedure 5 Work Plan | 156.6 KB | ||
10_SWPPP Manual | 8.7 MB |